Bigtekk Technologies
24h DispatchOrder within --:--:-- for same-day dispatch
55A7028-20-3/6/9-6CS2511

Check Delivery

Estimates at checkout; subject to carrier coverage.

TE CONNECTIVITY / RAYCHEM · Uncategorized

55A7028-20-3/6/9-6CS2511

55A7028-20-3/6/9-6CS2511

Buy 55A7028-20-3/6/9-6CS2511 Online

₹1,160.04 - ₹1,224.06
MOQ: 15 units

Price breaks

15 pcs₹1224.06
30 pcs₹1202.72
55 pcs₹1181.38
150+ pcs₹1160.04

For this quantity

₹1,224.06 / unit

Product information

Country of origin
As per manufacturer
Manufacturer
TE CONNECTIVITY / RAYCHEM
Imported & marketed by
Bigtekk Technologies, Khewat No. 769/5, Sector 69, Near Genpact Tower, Gurugram, Haryana – 122018
Warranty
90-day DOA warranty

₹1,160.04 - ₹1,224.06excl. GST

Total for 15 pcs incl. GST: ₹21,665.86

₹18,360.90 + ₹3,304.96 GST (18%)

Unavailable

Quantity

Request quote (RFQ)
Ships from partner warehouse · 7–14 day lead time
100% authentic · CoC available
B2B support on bulk lines
Sold By
B
Bigtekk Technologies
Authorised Distributor · Gurugram
AuthorizedISO CertB2B Fulfillment

Questions about this product? Email sales@bigtekk.in or raise a grievance.

Overview

The 55A7028-20-3/6/9-6CS2511 is an electronic component from TE CONNECTIVITY / RAYCHEM, available through BigTekk Technologies for OEMs, EMS, and maintenance buyers in India. Catalog reference: BIGTEKK_929810. RoHS: not compliant. Product identifiers and catalog attributes are listed below for procurement and BOM matching. It is available to order from ₹1224.06 per piece (minimum order 15). The manufacturer's factory lead time is about 60 weeks. Every order comes with a GST invoice, and a manufacturer certificate of conformance (CoC) is available on request. For volume pricing, obsolescence, or alternate part numbers, request a quote from our sourcing team.

Detailed description

55A7028-20-3/6/9-6Cs2511 |Raychem Te Connectivity

Specifications summary

ParameterValue
ManufacturerTE CONNECTIVITY / RAYCHEM
Manufacturer part number55A7028-20-3/6/9-6CS2511
RoHSNot compliant
Minimum order15 pieces
Factory lead time60 weeks
RFQ