Bigtekk Technologies
24h DispatchOrder within --:--:-- for same-day dispatch
55A1842-14-MST4-9CS2275

Check Delivery

Estimates at checkout; subject to carrier coverage.

TE CONNECTIVITY / RAYCHEM · Uncategorized

55A1842-14-MST4-9CS2275

55A1842-14-MST4-9CS2275

Buy 55A1842-14-MST4-9CS2275 Online

₹1,299.39 - ₹2,646.49
MOQ: 1,000 units

Price breaks

1000 pcs₹2646.49
2000 pcs₹2045.13
5000 pcs₹1659.70
10000 pcs₹1491.47
25000 pcs₹1396.06
50000+ pcs₹1299.39

For this quantity

₹2,646.49 / unit

Product information

Country of origin
As per manufacturer
Manufacturer
TE CONNECTIVITY / RAYCHEM
Imported & marketed by
Bigtekk Technologies, Khewat No. 769/5, Sector 69, Near Genpact Tower, Gurugram, Haryana – 122018
Warranty
90-day DOA warranty

₹1,299.39 - ₹2,646.49excl. GST

Total for 1,000 pcs incl. GST: ₹31,22,858.20

₹26,46,490.00 + ₹4,76,368.20 GST (18%)

Unavailable

Quantity

Request quote (RFQ)
Ships from partner warehouse · 7–14 day lead time
100% authentic · CoC available
B2B support on bulk lines
Sold By
B
Bigtekk Technologies
Authorised Distributor · Gurugram
AuthorizedISO CertB2B Fulfillment

Questions about this product? Email sales@bigtekk.in or raise a grievance.

Overview

The 55A1842-14-MST4-9CS2275 is an electronic component from TE CONNECTIVITY / RAYCHEM, available through BigTekk Technologies for OEMs, EMS, and maintenance buyers in India. Catalog reference: BIGTEKK_930810. Product identifiers and catalog attributes are listed below for procurement and BOM matching. It is available to order from ₹2646.49 per piece (minimum order 1000). The manufacturer's factory lead time is about 55 weeks. Every order comes with a GST invoice, and a manufacturer certificate of conformance (CoC) is available on request. For volume pricing, obsolescence, or alternate part numbers, request a quote from our sourcing team.

Detailed description

55A1842-14-MST4-9CS2275

Specifications summary

ParameterValue
ManufacturerTE CONNECTIVITY / RAYCHEM
Manufacturer part number55A1842-14-MST4-9CS2275
Minimum order1000 pieces
Factory lead time55 weeks
RFQ